Apply for a Building Permit in One-Stop Shop for Construction Permits

 

A Building Permit is a document issued by Department of Building Official that serves as your official consent to commence any construction, demolition, addition, or renovation of your property. As part of the Building Permit process, the Department of Building Official will look and analyze your submitted plans to guarantee that your application comply with the National Building Code, Fire Safety Requirements and Quezon City’s Local Building Code.

In One-Stop Shop for Construction Permits (OSSCP), the application process is only applicable for structures with maximum floor area of 1,500 sqm, which are either:

  • Single Dwelling Residential Buildings of not exceeding to three storeys high
  • Commercial Buildings of not more than 2 storeys high
  • Interior Renovations inside a building which already has a building permit and occupancy permit
  • Warehouses of not more than 2 storeys high and not for the storage of hazardous and combustible materials

Know the documents you need and the processes you must follow to secure a Building Permit in One Stop Shop for Construction Permits.

REQUIREMENTS IN SECURING BUILDING PERMITS

  1. LEGAL DOCUMENTS AND CLEARANCES
  2. Certified Blue Copy of Transfer Certificate of Title
  3. Tax Clearance or RPT Receipt & Bill
  4. Tax Declaration of the property
  5. If the lot is not in the name of the applicant:
  6. Deed of Absolute Sale
  7. Award Notice and/or Lease Contract
  8. Deed of Assignment or Donation
  9. Duly Notarized Authorization of Representative
  10. Others
  11. Duly Notarized Authorization of Representative
  12. For Corporation:
  13. Authority to sign (Corporate Secretary’s Affidavit)
  14. Supplemental Documents (if applicable)
  15.    MMDA, DPWH
  16. Affidavit of Undertaking, Consent, etc. (if necessary)

 

  1. LOCATIONAL CLEARANCE REQUIREMENTS
  2. Application form for Locational Clearance
  3. Lot Plan
    1. For new structures, lot plans should be signed and sealed by a Geodetic Engineer
  4. Architectural Plan
    1. BP 344 (Accessibility Law) compliance, if applicable
    2. Site Development Plan (showing parking layout)
  5. Building Permit and/or Certificate of Occupancy, previous Locational Clearance and (1) complete set of previous approved building plans, if application is renovation, addition or extension

 

  1. FIRE SAFETY EVALUATION CLEARANCE REQUIREMENTS
  2. Fire Safety Evaluation Clearance Application Form
  3. Fire Protection Plans, if applicable (refer to the Fire Code of the Philippines)
  4. Cost Estimate/Bill of Materials (signed and sealed)
  1. BUILDING PERMIT REQUIREMENTS

Technical Documents: Application forms must be duly accomplished, signed and sealed by the professionals & signed by the owner/s)

  1. Notarized Building Permit Application Form
  2. Sanitary/Plumbing Permit Application Form
  3. Electrical Permit Application Form
  4. Mechanical Permit Application Form
  5. Electronics Permit Application Form
  6. Photocopies of each professional’s valid Professional Regulation Commission (PRC) ID and current Professional Tax Receipts with seal; and 3 specimen signatures of each professional.
  1. BUILDING PLANS AT MINIMUM SCALE 1:100

Plans must be duly accomplished, signed and sealed by the professionals & signed by the owner/s)

  1. Structural Plans with PRC ID & PTR of the Civil Engineer who signed the plans
  2. Sanitary/Plumbing Plans
  3. Electrical Plans
  4. Mechanical Plans
  1. Electronics Plan

 

Supporting Documents must be signed and sealed by the professionals. Attach also clear photocopies of professional’s valid Professional Regulation Commission (PRC) ID and current Professional Tax Receipts

  1. Geotech Report/Soil Boring Test Report with photocopy of valid PRC ID of Geotech Engineer (for structures which are at least 3 storeys high)
  2. Project Specifications
  3. Structural Analysis and Design Computation, if involving structural members

STEPS IN APPLYING FOR BUILDING PERMITS IN ONE-STOP SHOP FOR CONSTRUCTION PERMIT

  1. Submit your accomplished application forms together with all the required documents at the Receiving Section of the One-Stop Shop for Construction Permits (OSSCP).
  • For complete requirements, you can verify the status of your application after five (5) working days by calling Quezon City Hall trunk line 988-4242 loc.1400.
  • For incomplete requirements, your application will be returned to you once verified by the receiving officer
    1. Get your Order of Payment at the Releasing Section if your application is compliant to Zoning Ordinance of 2016, Fire Code of the Philippines and National Building Code of the Philippines.
  • If your application is non-compliant, your documents will be returned to you at the Releasing Section together with the list of requirements/documents that you need to comply with, and submit these to the “Compliance Section” of the OSSCP for evaluation. After five (5) working days, proceed to Step 2.
    1. Pay at the cashier the indicated amount in your Order of Payment.
    2. Claim your permits, clearances, sticker and official receipts at the Releasing Section

CONTACT NUMBER OF ONE-STOP SHOP FOR CONSTRUCTION PERMITS

OSSCP OIC Engr. Kennedy Diokno

Ground floor, One Stop Shop for Construction Permits,

Building Regulatory Office, Quezon City Hall Compound

988-4242 loc. 1400/1401

 

 